Phone rides on the grade rod. Laser set once. Every finished stick, hit the green
button â it shows the next receiver move. That's the whole job.
đ NO-INSTALL â locked until Erik answers
Leg past the wall (DMH15 â far cleanout, ~79Ⲡ@ 1%, 119.3 â 118.5).
The plan calls DMH15 a cleanout but shows a 2.8Ⲡinternal drop â impossible in a riser.
The label or the mapping is wrong, and only the engineer can say which.
Nothing gets built at or past DMH15. Your 214Ⲡrun ends as an unconnected stub there.
đ COLLECTOR CALLOUTS â reference only (not runnable yet)
Endpoint mapping not yet confirmed â these become one-tap runs after the engineer signs off. Per-stick = 10Ⲡsticks.
ANY PIPE â enter the run
Read both structures off the CAD app. Every field matters â this is what keeps a
wrong invert from getting buried.
â Your inverts don't make the plan slope. Fix the numbers â or, if the ENGINEER changed them, record it: